Bid Results

To see bid amount for projects that have bid click on the Bidders List. Bid Tabulations will be posted as soon as complete.

Project:

.011 MGD Wastewater TReatment Facility No. 2 - Phase 1 within Harris County MUD No. 1
Project No.: 19900-502-1-STP
Engineer Brent
Pre-Bid Date: 7/29/2010 10:00:00 AM Mandatory
Bid Open Date: 8/5/2010 2:00:00 PM
Plan Available: Yes
Plan Cost: $100.00
Downloads:
Addendums
Tabulation
Adden. 1  7/29/2010
Mandatory Pre-Bid Sign In Sheet  7/29/2010
Minutes  8/3/2010
Adden. 2  8/4/2010
adden. 2  8/4/2010
adden. 2  8/4/2010
adden. 2  8/4/2010
adden. 2  8/4/2010
adden. 2  8/4/2010
adden. 2  8/4/2010
adden. 2  8/4/2010
Adden. 3  8/5/2010
adden. 3  8/5/2010
Adden. 4  8/5/2010
Final Bid Tabulation  8/11/2010

Project:

Water Distribution, San. Sewer Collection Drainage System Improve. & Overflow Det. Pond to serve Maple Ridge Place, Sec. 4 Within H.C. MUD 11
Project No.: 20007-004-1-UTL
Engineer Eric W.
Bid Open Date: 8/26/2010 2:00:00 PM
Plan Available: No
Plan Cost: $125.00
Downloads:
Addendums
Tabulation
Final Bid Tabulation  8/30/2010

Project:

Water Distribution, Sanitary Sewer and Drainge Improvements to Serve Saddlebrook Village Section Two within Harris County MUD No. 1
Project No.: 19914-002-2-UTL
Owner: SV Farms
Engineer Alex M
Bid Open Date: 8/5/2010 10:00:00 AM
Plan Available: Yes
Plan Cost: $100.00
Downloads:
Addendums
Tabulation
Final Bid Tabulation  8/10/2010